Zia Fertiliser resumes production
Our Correspondent, B'baria
The Asuganj Zia Fertiliser Factory resumed production yesterday after three days' suspension. The factory had stopped operation at about 7 pm on November 21 due to technical fault in the power plant. During the suspension, the factory suffered a production loss of about 1,300 tonnes of Urea a day, sources there said.
|
|